Today on the Clean Power Hour this week we talk about: 1)We tour one of John's rooftop commercial solar projects; 2)FERC Order 841 and battery storage regulations; an investors view of a solar stock (Ameresco); 3)the growing problem of E-waste as the solar panel avalanche continues to grow. 4)Coal power plants are old and getting older and this is why so many of them are being retired (https://www.carbonbrief.org/mapped-worlds-coal-power-plants). 5)Michigan’s largest solar project – 1900 acre, $250 million dollar, Assembly Solar Project developed by Ranger Power is 20% complete (the 239 MW project is the largest in Michigan to date).
Check out our podcast live interviews: http://www.cesnrg.com/podcast
Check out John's blog: https://commercialsolarguy.com/news/
John on twitter: https://twitter.com/SolarInMASS
Tim on twitter: https://twitter.com/tgmontague
Connect with Tim
Clean Power Hour
Clean Power Hour on YouTube
Tim on Twitter
Tim on LinkedIn
Email tim@cleanpowerhour.com
Review Clean Power Hour on Apple Podcasts
The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: CleanPowerHour@gmail.com
Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/
The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at http://www.chintpowersystems.com